by Alison | May 15, 2020 | CSC Case Studies, Remediation Planning & Oversight, Soil & Groundwater Sampling
CSC was selected to oversee and certify that all remediation work was completed in accordance with the Remedial Action Workplan (“RAW”) approved by the California Department of Toxic Substances Control for a nine-acre site. Over 1,400 soil samples were collected and...
by Alison | May 15, 2020 | CSC Case Studies, Emergency Response, Hazardous Materials Assessment, Remediation Planning & Oversight
Following an explosion in a coker unit, asbestos insulation particulates were spread throughout the plant and into the surrounding area. CSC was the first responder to arrive and assess the extent of the asbestos contamination. CSC collaborated with plant personnel,...
by Alison | May 15, 2020 | CSC Case Studies, Emergency Response, Remediation Planning & Oversight
CSC worked side-by-side with the U.S. Environmental Protection Agency (EPA) on an emergency basis during the mercury cleanup project spanning an entire high school campus, multiple school buses and several student homes. CSC developed the project design technical...
by Alison | May 15, 2020 | CSC Case Studies, Indoor Air Quality, Remediation Planning & Oversight
CSC conducted a full indoor air quality survey of the entire facility, including visual evaluation, moisture survey, sampling for mold in air, surfaces and dust, sampling for allergens, recording of temperature and relative humidity, assessment of the ventilation...
by Alison | May 15, 2020 | CSC Case Studies, Emergency Response, Hazardous Materials Assessment, Remediation Planning & Oversight
CSC was the first responder to a gas explosion that occurred at an auto paint and body shop. CSC performed field sampling of suspect asbestos containing materials; XRF testing to determine presence or absence of lead in painted materials; developed a South Coast Air...