CSC was selected to conduct semi-annual groundwater monitoring, perform a soil vapor survey and prepare a remedial action plan for approval by the Los Angeles Regional Water Quality Control Board. The site was a vehicle maintenance facility operated by a school district.  Two of the 11 monitoring wells were located in the middle of busy streets, which required a traffic management plan for safety during sampling events. 

CSC proposed remediation plan was accepted and site closure was completed in 2016.