Following an explosion in a coker unit, asbestos insulation particulates were spread throughout the plant and into the surrounding area. CSC was the first responder to arrive and assess the extent of the asbestos contamination. CSC collaborated with plant personnel, Cal/OSHA and the local air district to develop a stabilization and cleanup plan. CSC generated project design technical specifications and plans for the cleanup activities. CSC was on site to perform supervision of the contractor cleanup activities and was instrumental in bringing the project to a successful completion.